FEATURES:

  • This 206,000 SF world-class headquarters complex incorporated a 105,000 SF 4-story administration building and 101,000 SF 3-story technical center connected with a 2-story bridge.
  • The bridge connects the two buildings and has offices there for 50 producers.
  • The technical center features highly sophisticated construction with vibration-isolated sound studios, a sound isolated floating floor slab and a 3-story masonry constructed environmentally controlled film storage vault.
  • Also, the sound studio has space for a 60 piece orchestra and has a 125 seat theater.
  • The exterior skin was constructed of translucent panels, concrete, metal and glass.
  • Russ Berger Design Group did the design and programming of the video, data and telecommunication studies.

Project Cost: $36 Million
Architect: Garrison Architects, Mt. Laurel NJ and Russ Berger Design Group, Dallas, TX